Most packaging stockouts are not caused by a factory problem. They are caused by an ordering calendar problem: the buyer orders in the same month the stock is needed, and the chain of artwork approval, sampling, production, inspection, and shipping simply does not fit into that window. By the time the goods are ready, the season has already started, the shelves are empty, and the next season is already pressing. A packaging ordering calendar fixes this by turning the whole year into a plan, with each order placed months before the stock is needed, so that every selling season starts with goods already on hand.
This guide covers one thing only: the month-by-month ordering calendar for 2027, the timing of when to place each order for gift bags, gift boxes, and party supplies. It is different from the other guides in this series, and each one covers its own stage. Our packaging sampling process guide covers approving a physical sample before production. The AQL inspection guide covers the final quality check that decides whether a finished lot ships. The carton CBM guide covers carton maths and volume, and the container loading guide covers how goods are loaded for shipping. The RFQ template guide covers writing the enquiry, and the quote comparison guide covers comparing supplier quotes on the same terms. Sampling approves the design, inspection judges the lot, carton maths and loading cover the shipment, and the RFQ and quote guides cover the buying conversation; this guide covers only when to place each order through the year.
A packaging ordering calendar maps each month of 2027 to the orders you should place, working backwards from the date stock must reach your shelves. It accounts for factory production time, sampling and inspection, shipping, and the Spring Festival shutdown, so no season starts with empty shelves.
A calendar works backwards, not forwards. Start with the date the stock must be on your shelves, then walk backwards through every stage that has to happen before that date: shipping, inspection, production, sampling, and artwork approval. Each stage needs its own time, and each stage takes longer when factories are busy, so the order date lands weeks or months before the selling season. A buyer who plans this way places spring orders in the early months of the year, summer orders in spring, and Christmas orders in late summer, while a buyer who orders forwards places every order too late and spends the year chasing stock.
The calendar also has to respect the factory year, not just the selling year. Chinese factories close for the Spring Festival holiday, which falls in January or February, and production pauses for the holiday period. Factories also run at full capacity before major selling seasons, so production queues fill up and shipping space tightens as each holiday approaches. Ask your factory for its holiday dates for the year in writing, and write them into your calendar before you plan anything else, because every order in the first months of the year is shaped by that shutdown.
Use the table below as the one-page version of the year. The sections that follow explain each block in detail, so you can see not just what to order in each month, but why that month is the right time.
| Months | Order focus | Why this timing works |
|---|---|---|
| January–February | Spring stock, before the shutdown | Factories close for Spring Festival, so orders placed now beat the closure |
| March–April | Replenish and approve summer samples | Factories reopen and queues rebuild, so early approval keeps summer on track |
| May–June | Summer parties, weddings, World Cup | Peak season stock should already be in production or on the water |
| July–August | Autumn and Halloween pre-orders | Autumn production fills fast, so early orders secure capacity and shipping space |
| September–October | Christmas and New Year stock | Final window with time for production, inspection, and shipping |
| November–December | Review, reorder, plan 2028 | Reorder proven designs and set the next year calendar early |
January and February are for ordering ahead of the Spring Festival shutdown, when factories close for the holiday and production pauses. Place orders for spring stock now, confirm the factory holiday dates in writing, and keep enough buffer stock to sell through the shutdown. Late orders wait until factories reopen.
The first two months of the year set the tone for the whole calendar, because the Spring Festival shutdown sits right in the middle of them. Before the holiday, factories rush to finish orders, and production queues fill quickly as every buyer tries to get stock out before the closure. After the holiday, factories reopen gradually, workers return over several weeks, and production builds back up to full speed. An order placed in January, with artwork approved and the sample confirmed, can be finished before the shutdown. An order placed late, with artwork still unapproved, waits in the queue until after the holiday and then competes with every other buyer who also waited.
What you order in January and February depends on what you sell in spring. Spring covers a wide range of demand: spring weddings and showers, school and community events, Easter and spring festivals, and the first wave of outdoor parties as the weather warms. Gift bags and gift boxes for spring events belong in this window, and so do the party supplies that go with them, from tableware and decorations to favour bags and balloons. Browse our gift bags range and our gift boxes range to settle your spring designs early, while factories still have open capacity to take them on.
Buffer stock matters more in this window than at any other time of year. Keep enough stock on hand to sell through the shutdown weeks, when no new production is coming out of the factory. If your spring lines are already selling, count what you have, count what you expect to sell before factories reopen, and order the gap now. A buyer who runs out during the shutdown cannot fix it by ordering more, because there is no factory running to make it.
March and April are restart months, when factories reopen and production queues rebuild quickly. Use this window to replenish stock sold during the shutdown, approve samples for summer designs, and place orders for spring and early summer events. Early approval keeps your summer lines on schedule.
March and April are the restart months. Factories are back, production is building up again, and the buyers who ordered early are already receiving their spring stock. This is the window to do three things at once: replenish the lines that sold through during the shutdown, approve samples for your summer designs, and place the first orders for late spring and early summer events. Sampling deserves special attention here, because a sample approved in March leaves the whole of spring for production, while a sample still waiting for approval in May leaves almost no time at all.
Use March and April to lock in your summer range. Summer is the busiest season for party supplies: weddings peak, graduations and school parties fill the calendar, outdoor gatherings and barbecues run through the warm months, and retailers stock up for the long summer selling stretch. Gift bags for summer events, gift boxes for wedding favours and graduation gifts, and the full range of party supplies for outdoor celebrations should all be sampled and ordered in this window. The packaging sampling process guide explains how to move a design from artwork to an approved physical sample, and following that process in March and April is what keeps the summer lines on schedule.
Replenishment is the other job of these months. Look at what sold during the shutdown and the early spring weeks, and reorder the designs that moved fastest before they run out. Reordering a proven design is faster than launching a new one, because the artwork and the sample already exist, but it still needs its own production slot, so do not leave it until the shelf is already empty.
May and June cover the peak of summer parties and weddings, so orders placed now should be in production or on the water. This is also the window to order World Cup party supplies for the summer tournament, while factories still have capacity. Last-minute summer orders risk missing the season.
May and June are the peak of the summer season, and by now the calendar should be working for you rather than against you. The orders placed in March and April are in production or already on the water, and the stock arriving now is the stock that sells through the summer weeks. What you place in May and June is therefore top-up stock and late-season lines, not the core summer range. If the core range is still unapproved at this point, it is already late, and the honest move is to shift those designs to the autumn range rather than rush them into a summer that is already half gone.
One event deserves its own line in the May and June plan: the World Cup tournament in the summer, hosted across the United States, Canada, and Mexico. Watch parties, sports bars, fan gatherings, and retail promotions all need party supplies, from decorations and tableware to giveaway bags and themed favour packs. Demand for tournament stock is concentrated in a short window, so orders for World Cup lines should be placed while factories still have capacity, not after the tournament has already started. Our party supplies range covers the decorations, tableware, and favour lines that suit watch parties and fan events, and those lines should be ordered with the same early timing as the rest of the summer range.
Shipping deserves a word here too, because summer is when shipping space tightens. Sea freight is the usual choice for bulk packaging, and it needs its own time in the calendar, on top of production and inspection. Our sea freight versus air freight guide explains how the two options compare for packaging orders, and the comparison is worth reading before you commit a summer order to a shipping plan that leaves no room for delay.
July and August are the months to place autumn orders, including Halloween party supplies and gift bags and gift boxes. Factories are busy with autumn production, so early orders secure capacity and shipping space. Waiting until autumn to order Halloween stock usually means the season passes before the goods arrive.
July and August feel like the middle of summer, but on the ordering calendar they are autumn months. Halloween is the first big autumn event, and it is also one of the largest single selling seasons for party supplies in the year. Halloween decorations, themed tableware, favour bags, balloons, and gift bags and gift boxes for Halloween treats all need to be ordered in July and August, while factories still have autumn capacity. A Halloween order placed in autumn itself is an order placed too late, because production and shipping still have to happen before the season starts.
Autumn covers more than Halloween. Autumn weddings and harvest events, back-to-school demand, and the early wave of autumn festivals all need stock in the same window, and they compete with Halloween orders for the same factory capacity. Gift boxes for autumn gifts and favour packs, gift bags in autumn colours and designs, and the party supplies that go with autumn gatherings should be grouped into the same July and August ordering round. Grouping designs by season is also how you use the minimum order quantity well: each design carries its own minimum of 2000 pieces, so a season planned as a small set of strong designs is far easier to order than the same volume spread across many small designs.
Use July and August to confirm your autumn artwork as well. Designs that are still unapproved at the end of August will struggle to reach the shelves in time for the autumn season, so push approvals through now, while there is still time to correct a colour, a size, or a print detail without losing the season.
September and October are the final ordering window for Christmas and New Year stock, covering gift bags, gift boxes, and party supplies for the holiday season. Orders placed now still have time for production, inspection, and shipping. Any order placed later risks arriving after the selling season has already ended.
September and October are the final ordering window for the biggest selling season of the year. Christmas and New Year drive demand across every line: gift bags and gift boxes for holiday gifts, party supplies for Christmas parties and New Year celebrations, and favour packs and decorations for the whole holiday stretch. Orders placed in September and October still have time for production, inspection, and shipping before the season. Orders placed later than this window are gambling that every stage runs without a delay, and a single delay, a failed inspection, or a missed sailing can push the goods past the season entirely.
Christmas ordering also needs a hard look at your best sellers from the previous year. The designs that sold well last Christmas are the safest orders this Christmas, because their artwork and samples already exist and their demand is proven. New designs belong in the same order round, but they should be a smaller share of it, with their samples approved early in the window so that production can start without waiting. Do not let a new design hold up the whole order: if one design is still unapproved, split it out and let the proven designs move ahead.
Inspection is part of this window too. A final random inspection before shipment is the check that decides whether the lot ships, and it needs its own time after production finishes. Build inspection into the September and October plan, so that a lot which needs rework still has time to be corrected and re-inspected before the shipping date. An order that leaves no time for inspection leaves no room for fixing a problem either.
November and December are for selling through holiday stock, reviewing what sold well, and reordering proven designs before the year ends. This is also the time to plan your 2028 calendar, confirm next year factory holiday dates, and place early orders for the first season of 2028.
November and December are selling months first and ordering months second. Holiday stock is on the shelves, Christmas and New Year demand is at its peak, and the job is to sell through what you ordered in September and October. Watch what moves fastest, because those are the designs to reorder first, and watch what moves slowly, because those are the designs to drop or redesign next year. A short written review at the end of December, listing the best sellers and the slow movers by season, is the most useful document you will carry into the next year.
Reordering in November and December is for proven designs only. A design that sold well through the holiday season can be reordered before the year ends, so that stock is ready for the first season of the new year. A design that sold slowly should not be reordered on hope alone. Use the quiet weeks at the end of December to plan the 2028 calendar as well: ask your factory for next year holiday dates, mark the Spring Festival shutdown into the new calendar first, and place the first orders for the new year early, so that 2028 starts the way 2027 should have started.
Build your plan by listing every selling season, then working backwards through sampling, production, inspection, and shipping for each order. Group designs by season, keep the 2000-piece minimum in mind for each design, and write every date and approval into one shared calendar your whole team can see.
Building your own plan takes one afternoon and saves a year of chasing stock. Start by listing every selling season you serve, with the date each season starts on your shelves, then work backwards through sampling, production, inspection, and shipping to find the order date for each one. Write those order dates into a single calendar that your whole team can see, with the factory holiday dates marked first, so that nobody plans an order into a week when the factory is closed. Share the calendar with your factory too, so that both sides are working from the same dates.
Group your designs by season and by strength. Each design carries its own minimum order quantity, and at Kadi that minimum is 2000 pieces per design, with no exceptions, so the plan should concentrate each season on a small set of designs that sell well, rather than spreading the same volume across many designs that each carry their own minimum. A season with a few strong designs is easier to approve, easier to produce, easier to inspect, and easier to sell through than a season with many weak ones.
Certification claims belong in the plan as well, and the rule is simple. FSC certification covers paper products only, so paper gift bags and paper gift boxes may carry the FSC label when the paper is certified, with the claim limited to that paper item. Plastic tableware, plastic table covers, ribbon, metal parts, and laminated items cannot carry an FSC label or any FSC claim, because none of those materials is paper. A paper bag with a ribbon handle can only carry an FSC claim for the paper bag itself, never for the ribbon or for the whole piece as one item. Write the claim for each design into the plan next to its material, so that no catalogue or listing ever claims more than the material allows.
To start a custom order on your own size, colour, and printed design, use our custom party supplies page. All Kadi party supplies, gift bags, and gift boxes are made to order to your specification: material, size, colour, printed design, and packaging are produced as production orders, not taken from stock. Custom orders are welcome for every item in this guide, and every order is inspected against the written specification and the approved sample before shipment.
These six questions cover the points importers ask most about planning 2027 packaging orders: when to place the first order, how the Spring Festival shutdown affects timing, the best months for Halloween and Christmas stock, custom lead times, and the minimum order quantity at Kadi.
Place your first 2027 order in January, before the Spring Festival shutdown closes factories for the holiday period. An early order secures your place in the production queue and gives you stock to sell while factories are closed. Confirm the factory holiday dates in writing before you place the order.
The Spring Festival shutdown pauses factory production for the holiday period, so orders placed too late wait until factories reopen and restart. Production queues fill quickly before the holiday, which can push late orders back. Order early, confirm holiday dates, and keep buffer stock for the shutdown weeks.
Order Halloween stock in summer, so production and shipping finish well before the season starts. Order Christmas stock in late summer and early autumn, when factories still have open capacity. Late orders risk missing the season entirely, because production queues and shipping space fill up as the holidays approach.
Order custom gift bags and gift boxes at least one season ahead of the date you need them on your shelves. Custom work needs time for artwork approval, sampling, production, inspection, and shipping, and each stage takes longer when factories are busy. Build the full chain into your calendar.
Frequent small orders do not solve the planning problem, because every custom design still carries the same minimum order quantity and setup work. Planning ahead lets you combine designs into fewer, larger orders and keep stock flowing. At Kadi, the minimum is 2000 pieces per design, with no exceptions.
The minimum order quantity at Kadi is 2000 pieces per design, with no exceptions. Each combination of material, size, colour, printed design, and packaging counts as one design. Buyers should concentrate each order on a few designs that sell well and confirm every detail in writing before production starts.
Send Kadi the material, size, and quantity of your party supplies on WhatsApp for a personalised quotation, with your artwork and specification attached. Custom orders start at 2000 pieces per design, and the full range is at kadipaper.com.